| Author |
Thread Statistics | Show CCP posts - 32 post(s) |
|

CCP RubberBAND
CCP Engineering Corp CCP Engineering Alliance
302

|
Posted - 2014.04.28 12:08:00 -
[1] - Quote
Peter Powers wrote:ok, so now it is shiny and better looking and all, but uhm, it still seems to lack (or i did misread the post) one feature that i know me (and others) have been asking for in the past.
What about bulk-creating-jobs?
when i have 10 Scorch M BPC, then doing the same clicking (well i guess dragging now) etc 10 times is *extremly* annoying, so can we please have an option to clone jobs? can this dragging, clicking thing please be a template, and we can create 10 jobs without doing the same stuff over and over and over and over and over and over and over and over and over and over again?
regards, PP
The idea is that the system will remember all settings for a blueprint, so if you set up 1 Scorch M BPC, all subsequent blueprints of this type will default to the last submitted job settings.
So you set up the first blueprint, then just hit submit on the subsequent BPCs because everything is set to go.
Feel free to poke me on: Twitter |
|
|

CCP RubberBAND
CCP Engineering Corp CCP Engineering Alliance
302

|
Posted - 2014.04.28 12:18:00 -
[2] - Quote
Theodore Knox wrote:Looks like a vastly improved UI. But need to digest this. Are these changes going on Sisi before too long?
The plan is to have this on Singularity in the week following Fanfest.
So very soon. Feel free to poke me on: Twitter |
|
|

CCP RubberBAND
CCP Engineering Corp CCP Engineering Alliance
305

|
Posted - 2014.04.28 13:00:00 -
[3] - Quote
Elena Thiesant wrote:CCP RubberBAND wrote:So you set up the first blueprint, then just hit submit on the subsequent BPCs because everything is set to go. Ah, that's nice. Does it remember forever? Of, if I make a 15-run copy of the BPO I usually make 1-run copies of does it then remember the 15? Can I choose what it should remember (or choose when not to remember)?
We will have to nail down the details once it goes to Singularity. The idea however is that, it remembers the settings based on the last submitted job. If you are submitting a BPC of the same type with less runs, then it goes to the max number of runs based on availability of materials.
If you try and submit a BPC with more runs it should go to the max runs dependent on the materials available. Feel free to poke me on: Twitter |
|
| |
|